3Thomas M D A, Bamforth P B. Modelling chloride diffusion in concrete Effect of fly ash slag[J]. Cement and Concrete Research, 1999,29(4) :487-495.
4Prezzi M, Geyskens P, Monteiro P J M. Reliability approach to service life prediction of concrete exposed to marine environments[J]. ACI Materials Journal, 1996,93 (6): 544-552.
5Mangat P S, Molloy B T. Prediction of long-term chloride concentration in concrete [J]. Materials and Structures, 1994,27:338-346.
6Mangat P S, Limbachiya M C. Effect of initial curing on chloride diffusion in concrete repair materials[J ]. Cement and Concrete Research, 1999,29(9): 1475-1485.
7Clear K C. Time-to-corrosion of reinforcing steel in concrete slabs[A]. Performance after 830 daily salt applications (3) [C]. Report No. FHWA/RD-76/70,Washington D C. Federal Highway Administration,1976:(59).
8Wee T H, Wong S F, Swaddiwudhipong S, et al. A Prediction method for long-term chloride concentration profiles in hardened cement matrix materials[ J ]. ACI Materials Journal, 1997,94 (6): 565-576.
9Stephen L A, Dwayne A J, Matthew A M, et al. Predicting the service life of concrete marine structures: an environmental methodology[ J ]. ACI Structural Journal, 1998,95 ( 1 ): 27-36.
10Maage M, Helland S, Poulsen E, et al. Service life prediction of existing concrete structures exposed to marine environment[J].ACI Materials Journal, 1996,93(6) :602-608.