期刊文献+

软体坝构筑装置模型建立和系统参数确定 被引量:1

Model Establishment of Soft Body Dam Building Device and Determination of System Parameters
下载PDF
导出
摘要 采用泥浆泵吸岸边湿沙,冲灌丙伦布沙袋成沙排、沙枕,进而堆垒软体坝的方法,是破传统的筑坝新工艺。沉排装置是实施该工艺的关键设备。本文分析装置模型的动作机理,确定系统中沉排绞车拉力、速度最佳参数,并就改善工况运行条件的体系结构作了较深入的探讨。推荐一种将该装置置于双片浮体上的简易工程作业船,供群坝施工。 The method of piling up a soft body dam, which applies mud pumps to absort wet sand by bank and charge polypropylene bags to make sand mattress and pillows,is a new break-traditional technology for building a dam.The sinking mattress device is a key equipment.This paper analyses the operation principle of the device model,determines the value of the pull force of sinking mattress winch and the optimum speed parameter of the system.Also,the system configuration for improving operating condition has been investigated more deeply.A simplified working ship having two floating demibody,on which the device is placed,is recommended for building a group of dams.
出处 《交通部上海船舶运输科学研究所学报》 1994年第2期30-37,共8页
关键词 河道整治 筑坝装置 沙枕 沙排 参数 river regulation,dam building device,sinking mattress technology,sand pillow,sand mattress,platform,winch
  • 相关文献

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部