期刊文献+

大跨钢箱梁斜拉桥施工控制要点分析 被引量:17

Analysis of Key-points for Construction Control of Long-span Steel Box-girder Cable-stayed Bridge
下载PDF
导出
摘要 由于大跨钢箱梁斜拉桥结构自身的特性 ,风载、温度荷载等对其施工控制影响较大 ,为确保此类桥施工控制的准确性 ,必须对施工控制计算参数进行识别、修正。本文以武汉军山长江大桥主桥大跨钢箱梁斜拉桥施工控制为实例 ,分析了影响大跨钢箱梁斜拉桥施工控制的这两大要点。 Construction control of long?span steel box-girder cable?stayed bridges will be influenced dramatically by both wind and temperature load,owing to the structural characteristics. In order to control the construction of such bridges accurately, it′s necessary to verifying and adjusting calculating parameters to by control. Providing an instance of Wuhan Junshan Yangtze River Bridge, the thesis analyses the two key?points which influence construction control of long-span steel box?girder cable?stayed bridge.
作者 常英
出处 《公路交通科技》 EI CAS CSCD 北大核心 2001年第1期39-43,共5页 Journal of Highway and Transportation Research and Development
关键词 大跨径 钢箱梁 斜拉桥 施工控制 Long-span Steel box-girder Cable-stayed bridge Construction control
  • 相关文献

参考文献1

二级参考文献4

  • 1王应良 冯良平 等.南京长江第二大桥钢箱梁主要项目计算书[M].西南交通大学,1998..
  • 2森田泰生.南京长江第二大桥主桥技术设计--最终报告[M].日本长大桥梁公司,1997..
  • 3平原伸幸.多多罗大桥上部工事[J].桥梁(日),1997,.
  • 4王应良,强士中,郝超.芜湖长江大桥桥面板的有效宽度分析[J].桥梁建设,1998,28(3):13-15. 被引量:9

共引文献12

同被引文献66

引证文献17

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部