摘要
由于大跨钢箱梁斜拉桥结构自身的特性 ,风载、温度荷载等对其施工控制影响较大 ,为确保此类桥施工控制的准确性 ,必须对施工控制计算参数进行识别、修正。本文以武汉军山长江大桥主桥大跨钢箱梁斜拉桥施工控制为实例 ,分析了影响大跨钢箱梁斜拉桥施工控制的这两大要点。
Construction control of long?span steel box-girder cable?stayed bridges will be influenced dramatically by both wind and temperature load,owing to the structural characteristics. In order to control the construction of such bridges accurately, it′s necessary to verifying and adjusting calculating parameters to by control. Providing an instance of Wuhan Junshan Yangtze River Bridge, the thesis analyses the two key?points which influence construction control of long-span steel box?girder cable?stayed bridge.
出处
《公路交通科技》
EI
CAS
CSCD
北大核心
2001年第1期39-43,共5页
Journal of Highway and Transportation Research and Development
关键词
大跨径
钢箱梁
斜拉桥
施工控制
Long-span
Steel box-girder
Cable-stayed bridge
Construction control