4Reid R D.Characteristic management[J].Quality Progress,2003,36(11):50-92.
5Wang F K.Quality evaluation of a manufactured product with multiple characteristics[J].Quality and Reliability Engineering International,2006,22(2):230-236.
9Shen H,Wan S.Controlled sequential factorial design for simulation factor screening[J].European Journal of Operational Research,2008,198(2):511-519.
10Yah W,He Z,Tian W M.The application of the relief algorithm for indentifying CTQ in complex product[C].2011 2nd IEEE International Conference on Emergency Management and Management Sciences.Beijing:BUCT,2011:459-463.