铁水供应对转炉群布置的影响

Hot Metal Supply Impactd on Converter Layout
下载PDF
导出
摘要 在实测和解析某钢厂2座和3座转炉并排布置时的铁水包作业过程时间的基础上, 提出了3座和2座转炉并排布置时,铁水供应的限制性环节;说明3座转炉并排布置不适应快 速转炉的生产要求,计算在不同限制环节下,单座转炉的最大年生产能力.同时计算了日本新 型转炉群布置的年生产能力,探讨了其对高速连铸的适应性. The process time of hot metal ladle was measured and analyzed, and the neck of hot metal supply was pointed out when two or three converters are located in one line. The most annual capacity of one converter was calculated in different neck. The result is that three converters located in one line are not suitable for the production demand of fast converter In the meantime, anneal capacity is calculated, and the adaptability is discussed to the higher speed continuous casting about new converters layout in Japan. The references are provided for enterprise alteration in our country.
出处 《北京科技大学学报》 EI CAS CSCD 北大核心 2001年第2期101-105,共5页 Journal of University of Science and Technology Beijing
关键词 转炉 生产能力 铁水供应 并排布置 作业时间 布置方式 高速转铸 converter layout production capacity
  • 相关文献

参考文献5

  • 1徐安军.炼钢厂物流调控系统及其温度--时间流的解析与应用研究:学位论文[M].北京:北京科技大学,1996..
  • 2王英群,刘青,田乃媛.全连铸电炉炼钢厂的年生产能力分析[J].钢铁研究学报,1999,11(5):16-20. 被引量:2
  • 3蒋国昌.纯净钢的二次精炼[M].北京:冶金工业出版社,1998..
  • 4蒋国昌,纯净钢与二次精炼,1998年
  • 5徐安军,学位论文,1996年

二级参考文献2

  • 1王英群.全连铸电炉(长材型)炼钢厂的过程多维物流解析:(学位论文)[M].北京:北京科技大学,1998..
  • 2王英群,学位论文,1998年

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部