摘要
本文对项目内部收益率的计算方法进行了分析和评价,针对现行方法的不足之处进行了改良,并应用实例验证其有效性.
The computation models of IRR has been studied and evaluated in the paper .A improvenent Computation models of IRR has been proposed and its validity has ben testified.
出处
《基建优化》
2001年第2期18-19,共2页
Optimization of Capital Construction