摘要 针对南水北调中线工程供水系统的特点 ,应用大系统递阶分析的原理和方法 ,建立了三层递阶水量优化调度模型。采用模拟技术与优化技术相结合的途径 ,求解出满足系统整体供水目标下供水区水库的优化调度图 。 In this paper, the principle and methods of hierarchical analysis for large-scale system are applied to solve the problems of optimal water operation for the water transfer project from south to north (middle route)and the three-level hierarchical model is established. Having satisfied the total system water supply objects, the optimal regulation diagram of reservoir is determined by simulation technique combined with the optimization methods. It could provide science bases for the project's operation and decision-making in actuality operation condition in the future.
出处 《水科学进展》 EI CAS CSCD 北大核心 2001年第1期72-80,共9页 Advances in Water Science
关键词 南水北调中线工程 模拟模型 优化调度 水量 water transfer project from south to north (middle route) simulation model optimal operation
  • 相关文献

参考文献5

  • 1郭元裕 白宪台 等.湖北四湖地区除涝排水系统规划的大系统优化模型和求解方法[J].水利学报,1984,(11):1-14.
  • 2龙子泉,白宪台.抽水灌溉系统站库联合优化调度数学模型[J].水科学进展,1993,4(2):106-112. 被引量:3
  • 3长江水利委员会,南水北调中线工程论证报告及附件,1995年
  • 4华士乾,水资源系统分析指南,1988年
  • 5郭元裕,水利学报,1984年,11期,1页

二级参考文献1

共引文献2

同被引文献214

引证文献29

二级引证文献189

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部