三峡永久船闸人字门安装测量控制 被引量:1

Control of installation and measurement of the miter gate for Three Gorges Permanent Lock
下载PDF
导出
摘要 三峡永久船闸人字门安装具有施工技术难度大、总装精度要求高、安装部件多而杂等特点。安装技术人员结合三峡船闸的结构特殊性 ,经过多种方案比较 ,选取了最优化的控制网形及可靠易行的安装基准点设置方法 ,并从实际出发 ,介绍了安装施工过程中的各种测量具体操作方法。从三峡永久船闸已完成的北线一闸首人字门埋件安装质量情况看 ,此测量控制方案可行性强 。 The installation of the miter gate for Three Gorges Permanent Lock has the characteristics of big construction difficulty, high installation accuracy requirements and many assembly parts. The technicians took the structure particularities of the Lock into account and compared many alternatives. Then they selected optimized control network and a simple and reliable installation datum point setup method. The author also describes various observation methods in the installation and construction. Viewed from the installation quality of the embedding parts of a lock head miter gate in the completed north side of Three Gorges Permanent Lock, such observation control scheme is strong in feasibility and strict in accuracy control.
作者 韩伟清
出处 《水力发电》 北大核心 2001年第3期27-29,共3页 Water Power
关键词 金属结构 安装 测量控制 人字闸门 三峡工程 永久船闸 metal structure installation, measurement control, miter gate,Three Gorges permanent lock
  • 相关文献

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部