7Bertrand J.,H.V.Ooijen,2002,Workload based order release and productivity:a missing link,Production Planning and Control,13(7):665-678.
8Chen R.S.,K.Y.Lu,S.C.Yu,H.W.Tzeng and C.C.Chang,2003,A case study in the design of BTO/CTO shop floor control system,Information and Management,41:25-37.
9Ghiassi M.,C.Spera,2003,Defining the Internet-based supply chain system for mass customized markets,Computers and industrial Engineering,45(1):17-41.
10Gunasekaran A.,E.W.T.Ngai,2005,Build-to-Order Supply Chain Management:A literature review and framework for development,Journal of Operations Management,23(5):423-451.