期刊文献+

国际工程合同争议解决的ADR方式 被引量:3

原文传递
导出
作者 邱闯
出处 《建筑经济》 北大核心 2001年第3期25-27,共3页 Construction Economy
  • 相关文献

参考文献8

  • 1Fisher .Roger and Willian Ury(1981)Getting to Yes:Negotiating Agveement Without Giving In Hutchinson & Co.London
  • 2Bunni Neal G.(1997).The FIDIG Form of Contracz(2^nd ed).Blackwell Science.p.424.
  • 3Bunni Nael G.(1997).The FIDIG Form of Contrast(2^nd ed).Blackwell Sicence.p.424.
  • 4Bunni Nael G.(1997).The FIDIG Form of Contrast(2^nd ed).Blackwell Sicence.p.425.
  • 5Tackaberry John.'Concillation'the Conference on New Concepts in the Resolution of Disputed in International Construction Contracts,the Charted Institute of Arbitrators London June.1989.
  • 6Department of Education and Training of the American Arbitration Aacociation.'Role of a Mediator'.New York.
  • 7Davies Peter H.'Mediation'the Conference on New Concepts in the Resolution of Disputes in International Construction Contracts.the Charted Instituts of Arbitrators.London June.1989.
  • 8The Association of Engineering Firtns Practicing in the Geoscience.Maryland'ADR:Alternative Dispute Resolution for the Construction Industry'.1988

同被引文献15

  • 1方流芳.民事诉讼收费考[J].中国社会科学,1999(3):130-153. 被引量:185
  • 2蒲新新,张修林.浅析DAB争议解决方式的法律效力[J].建筑经济,2004,25(9):94-96. 被引量:3
  • 3孟凡密,张修林.国际工程合同争议解决方式评析与借鉴[J].建筑经济,2005,26(6):64-68. 被引量:8
  • 4FIDIC.施工合同条件[M].北京:机械工业出版社,2002.1-149.
  • 5FIDIC.土木工程施工合同条件[M].北京:航空工业出版社.1991.
  • 6http://www.lawfz.com/lunwen/jjf/hetong/20070502/273876_ 5.html.
  • 7P.Hibberd,P.Newman.工程争端替代解决方法与裁决[M].北京:中国建筑工业出版社.2004.
  • 8FIDIC.生产设备和设计一施工合同条件[M].北京:机械工业出版社.2002.
  • 9FIDIC.设计采购施工(EPC),交钥匙工程合同条件[M].北京:机械工业出版社.2002.
  • 10The World Bank. STANDARD BIDDING DOCUMENTS-Procurement of Works & User's Guide[M].UAS-The World Bank, 1995,2005.

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部