期刊文献+

带特殊工艺约束的并行机器生产线调度问题的一种遗传算法 被引量:21

SOLVING IDENTICAL PARALLEL MACHINE PRODUCTION LINE SCHEDULING PROBLEM WITH SPECIAL PROCEDURE CONSTRAINT BY GENETIC ALGORITHM
下载PDF
导出
摘要 研究带特殊工艺约束的并行机器生产线的调度方法 .以完工时间、拖期时间和超库存时间的惩罚量之和最小为调度目标 ,对该优化调度问题提出了一种遗传算法 ,并在问题建模、遗传算法编码、初始种群的产生办法、交叉及变异方法等方面作了研究 . The scheduling problem with special procedure constraint for an identical parallel machine production line is researched. The scheduling objective is to minimize the total punishment of makespan, tardy time and overstock time. A genetic algorithm is presented for solving the optimization scheduling problem. Researches are performed in several aspects such as problem modeling, coding, crossover and mutating of genetic algorithm and so on. Simulation results show that the proposed genetic algorithm is effective.
出处 《自动化学报》 EI CSCD 北大核心 2001年第3期381-386,共6页 Acta Automatica Sinica
基金 国家自然科学基金!( 60 0 0 4 0 1 0 ) 国家科技部中英科技合作基金资助项目
关键词 并行机器生产线 遗传算法 工艺约束 数值仿真 Genetic algorithms Optimization Production control
  • 相关文献

参考文献1

二级参考文献1

  • 1方剑,博士学位论文,1996年

共引文献14

同被引文献154

引证文献21

二级引证文献93

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部