摘要
为了早日实现高炉冶炼锰铁喷煤,借鉴国内外高炉喷煤的先进经验,分析了中国锰 铁高炉大喷煤量的技术难点,对锰铁高炉大喷煤的可行性及相应措施进行了探讨。
To realize pulverized coal injection for smelting blast furnace FeM n, the technical difficulties are analysed on Chinese large injection value of pulv erized coal for blast furnace FeMn using advanced experiences in all over the wo rld,the feasibility and appropriate measures are also probed into.
出处
《铁合金》
北大核心
2001年第1期25-30,共6页
Ferro-alloys
关键词
锰铁高炉
喷煤
煤比
冶炼
ferromanganese blast furnace,pulverized coal injection,comprehensiv e analysis