摘要
本文主要从经济优化、运行技术要求两个方面阐述华东电网抽水蓄能电站的开发规模,并对解决华东电网调峰提出了建议。
The developing csapacity of pupm storage power plant in ECPN, principally basedon operational economy and technology, is demonstrated in this paper. To meet the peak loaddemand in ECPN, recommendations are proposed by the author.
出处
《华东电力》
1992年第2期11-16,共6页
East China Electric Power
关键词
抽水蓄能电站
规划设计
华东电网
pump storage power plant planning design developong capacity