摘要
简述桂林电厂以大代小技改工程采用 135 MW汽轮机后 ,引起的设计问题的解决过程 ,如锅炉配套、辅机选型、运行实效。
This paper makes a brief introduction to the solving of problems resulting from the using of 135 MW steam turbine, such as the auxiliary equipment of boiler, type selection of auxiliary unit, actual operation effect and the improved schemes, etc