摘要
介绍虹源电厂 2× 135 MW机组干除灰系统的设备配置、工艺流程。
This paper makes an introduction to the configuration and process flowchart of dry ash handling system for the 2 x 135MW units in Hongyuan power plant, and it also discusses the main problem occurred in the test and commissioning, and the corresponding solutions
出处
《广西电力工程》
2001年第1期57-59,共3页
Guangxi Electric Power Engineering
关键词
电厂
气力除灰系统
工艺流程
输灰管略
fluidization
pneumatic ash handling
ash handling system
application
Hongyuan power plant