从法国Gardanne 250 MWCFB锅炉看循环流化床燃烧技术的发展
被引量:1
Development Tendency of CFBC Technolgy from View of Gardanne 250?MW CFB Boiler of EDF
摘要
以法国Gardanne电厂 2 5 0MW循环流化床锅炉的基本技术概况和法国电力局为放大到6 0 0MW进行的技术研究进行述评 。
The paper contributes an open comment on circulating fluidized bed boiler development from view of Gardanne 250?MW CFB boiler of EDF and the effort of scale up based on 250?MW boiler.
出处
《东北电力学院学报》
2001年第1期6-10,共5页
Journal of Northeast China Institute of Electric Power Engineering
参考文献7
-
1P. Jaud et al. The Provence 250 MW Unit: The largest CFB boiler ready for operation[J]. 3rd International Symposium on coal combustion,Sept. 1995, Beijing.
-
2Luc Lafanechere et al. Study of circulating fluidized bed fumace behavior in order to scale up to 600 MW[J] .3rd International Symposium on coal combustion, Sept. 1995, Beijing.
-
3P. Lucat et al. Status of the provence/Gardanne 250 MW CFB boiler[J]. 5th Intermational conference on circulating fluidized beds, May,1996.
-
4J. Cl. Semedard et al. GEC Alshrom Stein Industre Appoach to the development of very large CFB boilers[ J]. 5th International conference on circulating fluidized beds, May, 1996.
-
5Roulet V. Lucat P et al. SOPROLIF 250 MW CFB in Provence: two years of operation[J]. Power tech V79 n9 1999.
-
6Lothar Reh. Challenges of circulating fluid bed reactors in energy and raw material industries[J]. Chemical Engineering Science,54(1999).
-
7S.V.makarytchev. Enironmental Impact Analysis of ACFB-Based Gas and Power Cogeneration[J].ENERGY,Vol.23,No,9,1998.
同被引文献22
-
1蒋昌盛.燃用福建无烟煤的循环流化床钳炉之改计问题[A]..洁净煤技术国际研讨会论文集[C].煤炭工业出版社,1997.195-200.
-
2Michael G.Alliston, et al. Improved Water-Cooled Cyclone Constructions in CFBs [A]. Proceedings of 15th International Conference on Fluidized Bed Combustion [C]. New York: ASME, 1999. 7.
-
3Robert A Dyr, et al. The JEA Northside Repowering CFB Combustion Demonstration Project: An Update [A]. Proceedings of 16th International Conference on Fluidized Bed Combustion [C]. New York: ASME, 2001.8.
-
4E J Anthony, et al. Advanced ash management technologies for CFBC ash [J]. Waste Management, 2003 (23): 504.
-
5K M Sellakumar, et al. A COMPARISON STUDY OF ACFB AND PCFB ASH CHARACTERISTICS [A]. 6th International Conference on Circulating Fluidized Beds [C]. Germany: Wur'zburg, 1999.5.
-
6R Conn, et al. BENIFICIAL USE OF ACFB ASH [J]. Fluidized Bed .Combustion, ASME, New York, 1997(1): 510-511.
-
7R E Conn, et al. Utilization of CFB Fly Ash for Construction Applications [A]. Proceedings of 15th International Conference on Fluidized Bed Combustion [C]. New York: ASME, 1999. 5-14.
-
8Nowak W, et al. DESIGN AND OPERATION EXPERIENCE OF 230MWe CFB BOILERS AT TUROW POWER PLANT IN POLAND [A]. Proceedings of 15th International Conference on Fluidized Bed Combustion [C]. New York: ASME, 1999, 1.
-
9F Belin, et al. Update of Operating Experience of B&W IR-CFB Coal-Fired Boilers [A]. Proceedings of 15th International Conference on Fluidized Bed Combustion [C]. New York: ASME, 1999. 1.
-
10J-C SEMEDARD, et al. DEVELOPMENT OF ULTRA LARGE CFB BOILERS [A] Proceedings of the 16th International Conference on Fluidized Bed Combustion [C]. New York: ASME.2001.
二级引证文献5
-
1孙广良.循环流化床烧失率降低方法研究[J].技术与市场,2010,17(2):12-13. 被引量:2
-
2许杰,雷俊,周耕宇,王芸.循环流化床锅炉技术简介和发展趋势[J].甘肃电力技术,2010(3):48-52.
-
3袁建丽,张清峰.300MW单布风板循环流化床锅炉燃烧控制和调整研究[J].电站系统工程,2010(6):66-68. 被引量:5
-
4任福权.循环流化床二次风射流的研究现状[J].节能技术,2011,29(1):68-72. 被引量:7
-
5肖明洋.影响循环流化床锅炉飞灰中碳未燃尽损失因素的探讨[J].上海节能,2013(1):39-42. 被引量:1
-
1宋长玉,吴继高.国内外循环流化床技术概况及其在我国的发展趋势[J].东方锅炉,1994,0(4):1-6.
-
2宋长玉,吴继高.国内外循环流化床技术概况及其在我国的发展趋势[J].东方电气评论,1994,8(4):201-207. 被引量:1
-
3Milb.,DJ,施古樵.英国中央电力局风能研究[J].风力发电,1989,6(2):38-42.
-
4李长明.火力发电厂汽轮机能损问题研究[J].中国科技博览,2012(27):123-123.
-
5江宁,陈行庚,曹祖庆.火电厂优化运行中汽轮机能损分析问题的讨论[J].热力透平,2004,33(1):23-26. 被引量:1
-
6翟殿棠,赵建顺,王玉泰.EDA技术与电工电子技术实验教学改革[J].高校实验室工作研究,2002(3):21-22. 被引量:2
-
7蒋国钊,杨慕雄,冯灿辉,孙昌祥.国内电工产品表面处理技术概况[J].电机电器技术,1991(1):34-39.
-
8贾锡金.变电站自动化技术的应用及其发展趋势[J].建材发展导向,2010,8(03S):114-116.
-
9梁斌.关于现代电力电子技术应用的探讨[J].科技风,2011(12):55-55. 被引量:6
-
10齐儒柱.莱钢研究应用变频调速技术概况[J].莱钢科技,2002(F04):1-3.