摘要
扼要介绍了一些年来对三峡工程永久船闸高边坡岩体的长期变形与稳定性进行研究的主要成果 ,阐明了这项研究的重要性及要求解决的问题 .分别就实验、监测和理论分析等方面探讨了已取得的研究工作进展 ,提出了研究的主要结论和对设计、施工的建议意见以及尚待深化评价的若干问题 .
This paper introduces briefly some chief research results in studying the long term deformation and stability of high rock slope of the permanent ship lock,Three Gorges Project on the Yang tze River.The study objective and the problems to be solved are here discussed.According to some important aspects,such as lab experiments,monitoring in situ and theoretical analyses,etc.,the article investigates the recent development of research work already obtained,puts forward the main research conclusions,suggestions and proposals on the design and construction of the project and proposes the problems requried for further evaluation.
出处
《同济大学学报(自然科学版)》
EI
CAS
CSCD
北大核心
2001年第3期253-257,共5页
Journal of Tongji University:Natural Science
基金
国家自然科学基金
中国长江三峡工程开发总公司联合资助重大基金!项目 (5 94936 0 0 )