摘要
对双方因素作用下工程延期的计算问题进行了探讨分析 ,建立了数学模型 ,给出了计算步骤 .
This paper makes a study and analysis on the calculating methods of engineering prolongation which is under the affection of double factors.A mathematical model is established and the calculating procedure is deduced.