摘要
介绍了靖远电厂 2号机组热控技术改造中将电气控制纳入计算机分散控制系统 (DCS)在设计、投运时遇到的实际问题及解决办法 。
ZHANG Shicai, MA Chengxia, TIAN Niansheng et al Abstract Encountered problems and their solutions are introduced in the process of design, commissioning of bringing partial electric control into DCS when making thermal & control retrofit at unit 2, Jingyuan Power Station. The exited problems and development ideas after the entrance of electric control into DCS are discussed as well.
出处
《西北电力技术》
2001年第1期4-7,共4页
Northwest China Electric Power