摘要
在丰满大坝坝顶水平位移分析中存在着明显的欠拟合情况,文中采用扩充后含有积分回归因子的因子集对其重新建立了数学模型,分析结果表明欠拟合现象有了很大改善,模型精度也有很大提高。
The horizontal shift analysis for the dam top of Fengman Power Plant presents evident ill-fit problem.In this paper,another mathematical model is established for it by adopting the factor set including integrated regression factor in its extension. The result of analysis shows that the ill-fit phenomenon is greatly improved,the precision of model is raised greatly too.
出处
《东北电力技术》
1999年第6期5-8,40,共5页
Northeast Electric Power Technology