摘要
针对国内目前深基坑围护方案设计中 ,只重视技术设计 ,而缺乏对造价、环境、工期及不可见等因素综合考虑的现状 。
Present design projects of deep excavation retaining scheme mainly take into account the technology factors only,the comprehensive consideration of cost, time, circumstances and unpredictable events are usually ignored. The paper proposes a fuzzy diagnosis matrix based on comprehensive judging the scheme under certain design conditions.
出处
《浙江大学学报(理学版)》
CAS
CSCD
2001年第3期333-336,共4页
Journal of Zhejiang University(Science Edition)