摘要
本文主要根据国内300MW、600MW引进机组的运行情况,从总体结构上分析了亚临界锅炉摆动式燃烧器喷嘴摆动机构的不合理之处,并提出了改进方案。
The author has analysed the structural irrationality in tilting burners of various exist imported 300 and 600MW subcritical boilers, according to the fieldoperating experience. Improvements in design are suggested.
出处
《华东电力》
1991年第8期1-5,共5页
East China Electric Power