摘要
本文通过供热发电机组的运行情况,论述了机组选型与热网的关系,并从系统图影射出建设规模与投资的关系,同时比较系统地阐述了第二台机组的选择要点。
This article first describes the performance of the first turbo-generator-set which went into production in 1986 according to consuming steam features of the mill and the thermal power station. Through the practical operation. it proves that the selection is correct. The selection of the second set to meet the need of electricity & the process steam is discussed and the key for selecting the second turbo-generator-set is pointed out.
出处
《中国造纸》
CAS
北大核心
1991年第1期20-24,共5页
China Pulp & Paper