万家寨引黄工程总干线一、二级泵站蜗壳基础设计

Foundation Design for Scroll Case of Pamp Station NO.1 and No.2 in General Line of YRDP
下载PDF
导出
摘要 万家寨引黄工程总干线一、二级泵站的蜗壳基础由于机电设备要求的限制,只是一个大体积混凝土表面凸起的 45 cm 宽,23 cm 高的混凝土圆台,设计中考虑基础受力较大,锚板不采用普通的锚筋而是采用型钢来固定,满足了基础受力要求. : Base on design requirement ofa electrical and mechanical equipment of pump station No.1 and No.2 in Wanjiazhai Yellow River Diversion Project, the scroll case foundation just is a mass concrete short for frustum of a cone with 45 cm wide and 23 cm high. Because of stressing on foundation is considerable, section steel fixing foundation is adopted to meet the design requirement.
出处 《水利水电技术》 CSCD 北大核心 2001年第4期20-21,共2页 Water Resources and Hydropower Engineering
关键词 泵站 蜗壳基础 型钢埋件 焊缝 基础设计 万家寨引黄工程 : scroll case foundation; section steel embedded parts; welded joint; construction technique; foundation design