摘要
较详细地论述了潮白河大桥主桥———中承式钢管混凝土拱桥的总体设计及构造上的部分特点、各阶段的内力计算及分析 ,并简要介绍了主桥的施工设计。
The general design, constructional features and the analysis and calculations of the internal forces in different stages of the main spans of Chao bai River Bridge three spans of half through concrete filled steel tube arch bridge are presented in detail. The construction technology is briefly introduced.
出处
《桥梁建设》
EI
CSCD
北大核心
2001年第2期45-49,共5页
Bridge Construction
关键词
拱桥
中承式桥
钢管混凝土结构
桥梁设计
arch bridge
half through bridge
concrete filled steel tube structure
bridge design