摘要
本试验研究是利用水的能量冲填筑坝,冲填材料为中砂、粗砂,针对筑坝中的细粒土流失、砂浆浓度、干密度、位移、含水量、孔隙压力、沉降量、均匀性等论证水力充填筑坝的可行性,解决筑坝中的有关技术问题。
This test studies filling dam by water-power. The fill material is medium sand, coarse sand. The feasibility of constructing dam by hydraulic fill is proved to counter fine soil loss, sand grout density, dry density, displacement, moisture content, pore pressure, settlement and homogeneity for solve some technical issues in constructing dam.
出处
《吉林水利》
2001年第4期6-9,共4页
Jilin Water Resources