摘要
湛江发电厂在年前完成了交换机的组网。该工程的实施 ,解决了厂内 3地之间的交换机组网及行政交换机的全自动入网 ,并对该方案的可行性及实用性作了详细介绍。
The exchange network construction in Zhanjiang power plant was completed before the year. Three partners in plant realized exchanging and the administrative exchange's automatic entering network was solved too. Then the feasible and practical characteristic of the plan was introduced in detail.
出处
《电力系统通信》
2001年第5期37-38,41,共3页
Telecommunications for Electric Power System