期刊文献+

大坝施工混凝土质量的评价体系

System for Quality Assessment of Dam Construction Concrete
下载PDF
导出
摘要 本文介绍了大坝施工混凝土质量的评价系统软件的设计思路和设计成果。它利用现代计算机技术和应用模糊数学理论评价混凝土重力坝和拱坝单块和整体的质量。在采用模糊综合评价工程质量中,对不同工艺环节,对坝体不同部位,鉴于其质量要求的差异应赋予不同的权重,在权重的取值上采用了专家调查排序,定量转化的方法是比较适宜的。在程序设计中,评价数学模型采用了BASIC程序,该模块通过*TXT文件实现了与整个大坝混凝土质量微机管理系统的接口及数据传递。 The design considerations and results for system software for quality assessment of dam construction concrete are presented. The quality of single block and monoblock for concrete gravity dam and arch dam is evaluated by the application of modern computer technology and fuzzy mathematics theory. In fuzzy comprehensive assessment on project quality,according to different quality requirements,differnt weightings are given to different technological processes and different parts of dam . The weighting values are selected by specialist investigation sequencing and quantitative conversion. It is a suitable method. In program design, BASIC progrom is used to evaluate mathematical model. Through * TXT file,the modular is interfaced with microcomputor controlled system for dam concrete quality and data transfer is realized with easy and flexible operation.
机构地区 成都科技大学
出处 《四川水力发电》 1993年第3期39-44,56,共7页 Sichuan Hydropower
关键词 质量评价 模糊数学 BASIC程序 混凝土坝 dam construction concrete,quality assessment, fuzzy mathmatics, assessment on mathmatical model, BASIC program.
  • 相关文献

参考文献3

  • 1应龙根.因子分析[J]系统工程,1987(02).
  • 2SDJ 249-1988.水利水电基本建设工程单元工程质量等级评定标准(一)[S],1988.
  • 3汪培庄.模糊集合论及其应用[M]上海科学技术出版社,1983.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部