摘要
本文简要的介绍了瀑布沟工程水文分析计算主要依据站的选定和基本资料的插补延长,以及径流、洪水的分析计算方法.在可行性研究阶段水文成果(通过审查)和新设立的毛头码水文站所取得的数年水文资料的基础上,将初设阶段对可行性研究阶段的水文分析计算方法和成果进行验证和补充的情况重点予以介绍.
Selection of gauging stations where main hydrologic analysis considerations for Pubugou Project were obtained.the extrapolation of interpolation of the basic data,analysis method for runoff and flood are briefly introduced. Based on hydrologic data results obtained at feasibility study stage (passed examination) and long-term hydrologic data obtained in newly-established Maotouma Gauging Station,the fact is described in detail that the hydrologic analysis methods and results in feasibility study stage were checked and compl-mented in Preliminary Design Stage.
出处
《四川水力发电》
1992年第4期43-50,共8页
Sichuan Hydropower
关键词
瀑布沟电站
水文分析
径流洪水
Pubugou Hydropower Station
hydrologic analysis
extrapolation of data interpolation
analysis for runoff and flood.