摘要
“信息化施工”和“动态设计”方法的引入 ,使基坑支护工程的设计与施工两环节紧密结合 ,可随时根据监测结果调整设计参数和施工工艺 ,从而既保证了工程的安全 。
The introduction of information construction and dynamic designing closely links the designing of pit support with construction. The in-time adjust of designing parameter and construction technique based on the monitoring result guarantees the safe construction and reduces the cost.
出处
《地质与勘探》
CAS
CSCD
北大核心
2001年第3期78-80,共3页
Geology and Exploration