批量制造业交货窗口提前/拖期生产计划方法 被引量:3

EARLINESS/TARDINESS PRODUCTION PLANNING APPROACH WITH DUE WINDOW FOR MASS MANUFACTURING SYSTEMS
下载PDF
导出
摘要 建立批量制造企业在交货期窗口下的提前/拖期生产计划模型,将交货期窗口(due-window)概念引入到带有能力约束的提前/拖期生产计划中,拓宽了生产计划问题研究的范围.并利用数学推导,将所建模型转化为线性规划模型,使得该模型运用单纯形法就可求取精确的最优解,从而解决了开发中的CONWIP集成化生产管理软件对不确定交货期主生产计划的编制问题. In order to closely describe practical problems,an earliness/tardiness production planning model with due windows for mass manufacturing systems is built to control production by just in time philosophy.The model is translated into a linear programming by means of mathematical deduction.Then,the optimal production planning can be obtained by the simplex method.The proposed method extends the concept of due window from earliness/tardiness scheduling problems into production planning problems with capacity constraints and solves the problem of production planning with due window in the software of CONWIP production management.
出处 《系统工程学报》 CSCD 1998年第4期38-44,共7页 Journal of Systems Engineering
基金 国家自然科学基金 国家863计划
关键词 交货期窗口 准时化思想 提前/拖期生产计划 线性规划 due window,just in time philosophy,earliness/tardiness production planning,linear programming
  • 相关文献

参考文献2

  • 1Wang Dingwei,Comput Ind Eng,1995年,28卷,425页
  • 2钱颂迪,运筹学,1990年

同被引文献27

  • 1侯志林,金毅,李奇.总体生产计划(APP)的模糊控制方法研究[J].管理工程学报,1995,9(4):251-256. 被引量:3
  • 2熊禾根,李建军,孔建益,蒋国璋,杨金堂.单件生产系统中动态车间作业计划与监控系统的集成研究[J].中国制造业信息化(学术版),2006,35(1):21-23. 被引量:9
  • 3Zadeh L A.Fuzzy sets[J].Information and Control,1965,8:338-353.
  • 4Sugimori Y,Kusunoki K,Cho F,et al.Toyota production system andkanban system materialization of just-intime and respect-for-human system[J].International Journal of Production Research,1977,15:553-564.
  • 5Wang D W.Earliness/Tardiness production planning approaches for manufacturing systems[J].Computers &Industry Engineering.1995.28(3):425-436.
  • 6Wang D W,Fang S C.Semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm[J].Computer & Mathematics with Applications,1996,31 (8):95-106.
  • 7Wang D W,et al.Experiment push/pull production planning and control system[J].Production Planning and Control,1996,7:236-241.
  • 8Wang W,Wang D W.Ip W H.JIT production planning approach with fuzzy due date for OKP manufacturing systems[J].International Journal of Production Economics,1999,58:209-215.
  • 9Liu B.Theory and Practice of Uncertain Programming[M].Physica-Verlag,Heideberg,2002.
  • 10Liu B,Liu Y K.Expected value of fuzzy variable and fuzzy expected value models[J].IEEE Transactions on Fuzzy Systems,2002,10(4):445-450.

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部