摘要
以柔性联接装配型拉动生产系统为对象,应用极大代数法,建立了柔性联接装配型拉动生产系统的离散事件模型;并进行了系统有限扰动分析,扰动分析证明装配型拉动生产系统能有效降低库存.
In this paper, the DEDS models of paralleled serial pull production system with Max Algebra method are established,and a limited perturbation analysis for this kind of pull production line,which has proved to be available to decresase the stock quantities is also made.
出处
《系统工程学报》
CSCD
1998年第4期52-57,共6页
Journal of Systems Engineering