摘要
重庆市主城排水系统的污水处理方案从以自然汇水区为主的排水和处理方案转为集中截流处理。本文利用MIKE模型,对重庆市主城排水系统项目的各方案进行了比较,结合模型的解析结果,提出应结合三峡成库时间,采用分阶段逐步提高的最优方案。
The plan of treatment wastewater from natural water sections to centralize treatment. In the article the MIKE model was used to compare the plans of drainage system in Chongqing City. With the result of resolving the model, a suggestion was provided that' s we should thinking over the duration of constructing the Three - Gorge reservoir to actualize the best plan step by step.