摘要
通过对马平高速公路沿线水土流失现状和特点的分析 ,对沿线公路施工区和弃土弃渣场的水土流失进行了预测 ,预测结果表明 ,本项目建设可能新增的水土流失量为 934 33kt。
Through analysis of the status and features of soil and water conservation along Maping Expressway,the volume of soil and water loss along the line is forecasted.It's shown from the result that the possible volume of soil and water loss in this construction item is 93.433×10 4t.Based on the forecasted result,the preventional measures are proposed.
关键词
水土保持
高速公路
防治措施
公路建设
soil and water conservation
expressway
preventional measures