期刊文献+

圆梁山隧道毛坝向斜段岩溶水均衡研究 被引量:4

A RESEARCH INTO THE KARST WATER BALANCE OF YUANGLIANGSHAN TUNNEL IN THE MAOBA SYNCLINE
下载PDF
导出
摘要 为了对圆梁山隧道毛坝向斜段岩溶水径流强度、水量收支状况有一个概括的了解 ,以及深入认识隧道通过层位地下水的贮量 ,需要对岩溶水的补径排条件及收支状况进行均衡分析。根据毛坝向斜的地质环境条件 ,采用降水资料类比生成岩溶水排泄量的流量过程曲线的手段 ,较好地实现了缺少足够的水量动态资料情况下的均衡分析。 The Yuanliangshan tunnel is a key project in the Chongqing Huaihua railway. The Maoba syncline, one section of the Yuanliangshan tunnel, mainly consists of limestone in Permian and Lower Trias layers. The inburst of karst water is a main geologic hazard problem in the construction of tunnels. To find out the runoff intensity of the karst water and its balance between rainfall recharge and karst water outflow in the Maoba syncline , and groundwater reserves of aquifers which the tunnel goes through, this paper analyses the karst water balance in this region. Based on the geologic conditions of the Maoba syncline, the flux process curve of the karst water outflow is gained by analogy from the rainfall data. Though there is lack of enough sequent observed data of the water quantity, it satisfies that the Maoba syncline karst water balance analyses. The result reveals that there is the positive balance in the water cycle of the Maoba syncline.
出处 《成都理工学院学报》 CAS CSCD 北大核心 2001年第2期135-138,共4页 Journal of Chengdu University of Technology
关键词 岩溶水 降水入渗补给量 流量过程线 圆梁山隧道 径流强度 地下水 karst water balance rainfall recharge quantity flux process curve Yuanliangshan tunnel
  • 相关文献

参考文献6

  • 1铁道部第二勘测设计院地路处.岩溶工程地质[M].北京:中国铁道出版社,1984..
  • 2中国科学院地质研究所岩溶研究组.中国岩溶研究[M].北京:科学出版社,1987..
  • 3四川省地质局南江水文地质工程地质大队.1:20万区域水文地质普查报告(酉阳幅)[M].成都:四川省地质局,1979..
  • 4中科院地质所岩溶研究组,中国岩溶研究,1987年
  • 5铁道部第二勘测设计院地路处,岩溶工程地质,1984年
  • 6四川省地质局南江水文地质工程地质大队,1:20万区域水文地质普查报告(酉阳幅),1979年

共引文献10

同被引文献18

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部