摘要
兰州铁路分局在影响大、方案制定难度大的情况下 ,重点做好优化方案 ,周密准备、统一指挥 ,且有良好的施工组织 ,从而顺利、安全地对兰州东站 2 #、4 #道岔进行了技改更换 ,既保证了运输秩序 ,也确保了运输与施工的安全。
Under the conditions of heavy influence and difficulties to produce the plan, Lanzhou Sub Administration successfully replaced the No. 2 and No. 4 turnout at Lanzhou east station. This operation ensures not only the order of transportation, but also the safety of transport and construction. This is a typical construction operation and it has a directive function to other construction work.
出处
《铁道运输与经济》
北大核心
2001年第6期19-21,共3页
Railway Transport and Economy