摘要
本文就国内应用直接法、点柱法、进路法、人工底柱法,回采充填采矿法的顶底柱情况进行了论述,并指明了存在的问题。
This paper gives a brief description on the application of direct method,doited pillar method.lane type working method and artificial sill pillar method to the recovery of top and sill pillar in the stope mined by filling method. The problems existed in the application of these methods are pointed out in this paper.
出处
《黄金》
CAS
北大核心
1991年第8期14-16,共3页
Gold
关键词
充填采矿法
点柱法
人工底柱法
filling method
dotted pillar method
artif ical sill pillar method
lane type working method