中三家金矿全泥氰化炭浸工艺是当年设计、当年施工、当年投产、并一次投产成功。改造后工艺流程合理,金回收率增加幅度为14.51%,并且解决了小规模黄金矿山精矿销售的路途损失,达到就地产金的目的,经济效益显著。
The all-sliming CIL plant of Zhong-Shan-Jia Gold Mine was designed, constructed and put into production at one stroke in the same year with great success. The remoulded flowsheet was reasonable, resulting in the gold recovery increased by 14.15%, the goal to produce gold on the spot attained and the small-sized gold mine's problem of concentrate loss on the way for sale resolved.