摘要
根据扬州市南绕城公路软土路段的实测沉降资料 ,采用双曲线法预测各施工阶段测点的沉降和工后沉降量 。
Based on the site settlement information of soft soil highway section of Nan Rao Cheng highway of Yangzhou city, the settlement after construction of every stage is forecasted by the method of hyperbola. The gist can be supplied for the construction of pavement structure and it can also be used to determine the dapause.
出处
《扬州大学学报(自然科学版)》
CAS
CSCD
2001年第2期75-78,共4页
Journal of Yangzhou University:Natural Science Edition
基金
江苏省教委自然科学基金资助项目!(98KJB170 0 0 1)
关键词
软土地基
路基
工后沉降量
预测
soft soil ground
roadbed
settlement after construction