摘要 研究随机需求下 ,单层多产品、资源能力受限的批量问题 .对资源能力确定的情形 ,给出机会约束规划模型 .对资源能力不确定的情形 ,基于执行计划的策略提出了一种随机环境下的期望值模型 .本文采用基于随机模拟的遗传算法求解上述两种模型 .通过对算例结果进行方差分析 ,研究各种模型参数和环境变量对目标费用的影响 .最后 ,对该问题的进一步研究工作进行了展望 . The single-stage, capacitated lot-sizing problems with multiple products and random demands are considered in this paper. A chance-constrained programming model and an expectation model under stochastic environment based on real production strategies are presented for the case of deterministic capacity constrained and the case of uncertain capacity respectively. The genetic algorithm based on stochastic simulation is used to solve both of the models. The paper studies the effects of various model parameters and environmental factors on the objective costs using analysis of variance, and concludes with some advice for future research activities in the end.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2001年第6期1-6,共6页 Systems Engineering-Theory & Practice
基金 国家自然科学基金! ( 69584 0 0 5)
关键词 随机批量问题 机会约束规划 随机环境 遗传算法 stochastic lot-sizing problem chance-constrained programming genetic algorithm stochastic environment
  • 相关文献

参考文献1

  • 1Liu B,Uncertainprogramming,1999年

同被引文献51

  • 1Chen Fangrou. Decentralized supply chain subject to information delays[J]. Management Science, 1999, 45(8):1076--1090.
  • 2Cachon Gerard P, Zipkin Paul H. Competitive and cooperative inventory policies in a two-stage supply chain[J]. Management Science, 1999, 45(7): 936--953.
  • 3Cachon Gerard P. Managing supply chain demand variability with scheduling ordering policies[J]. Management Science, 1999, 45(6) : 843--856.
  • 4ICorbett Charles J. Stochastic inventory system in a supply chain with asymmetric information: Cycle stocks, safety stocks, and conksignment stock[J]. Operations Research, 2001, 49(4): 487--500.
  • 5Cachon Gerard P. Stock wars: Inventory competition in a two-echelon supply chain with multiple retailers[J]. Operations Research,2001, 49(5): 658--674.
  • 6ITormos P, Lova A. Tools for resource-constrained project scheduling and control: Forward and backward slack analysis[J]. Journal of Operations Research Society, 2001, 52:779--788.
  • 7Baykasoglu A. Goal programming using multiple-objective TABU search [ J]. Journal of Operations Research Society, 2001, 52:1359--1369.
  • 8Rodrigues M T M,Gimeno L,Passos C A S,et al.Reactive scheduling approach for multipurpose chemical batch plants[J].Computers Chem Engng,1996,20:S1215-S1220.
  • 9Ierapetritou M G,Flouda C A.Effective continuous-time formulation for short-term scheduling.1.Multipurpose batch processes[J].Ind Eng Chem Res,1998,37(11):4341 -4359.
  • 10Jeetmanyu P V,Ierapetritou M G.Robust short-term scheduling of multiproduct batch plants under demand uncertainty[J].Ind Eng Chem Res,2001,40:4543-4554.

引证文献5

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部