摘要
利用人工神经网络独特的结构和处理信息的方法,以实际工程为背景,编制了岩土工程观测数据优化程序,结合德兴铜矿2号尾矿坝B-B测线浸润线观测实例进行分析研究,使得优化的结果与实际相吻合。
By making use of the unique structure and the technique of information process of artificial neural network, this paper, on the background of a practical engineering project, coded a majorization program for observation of geotechnical works. The studies and analyses on the in-situ monitored data on the percolation line of the measuring line B-B in the tail dam of Dexin Copper Mine show that the majorized results are well coincident with real situation.
出处
《岩土力学》
EI
CAS
CSCD
北大核心
2001年第2期229-232,共4页
Rock and Soil Mechanics
关键词
岩土工程
浸润线观测
观测数据优化
神经网络
反向传播算法
Dams
Data processing
Monitoring
Neural networks
Percolation (computer storage)
Real time systems