摘要
水库蓄水后,下泄清水对下游河床产生长距离冲刷,同流量条件下水位降低。三峡水库蓄水后河床下切变形对航运构成影响,尤以近坝段为甚。应采取工程和管理措施,保障航运畅通。
After water filling, the discharge from the reservoir will produce long-distance scouring to the downstream river bed and water level will be lowered under the same flow conditions. The cutted deformation of river bed after water filling of the Three-Gorges reservoir will influence navigation, especially at the river reach near Gezhouba. Thus engineering and management measures shall be taken to ensure smooth navigation.
出处
《水运工程》
北大核心
2001年第5期10-14,19,共6页
Port & Waterway Engineering
关键词
三峡工程
下切变形
葛洲坝近坝段
通航管理
Three-Gorges Project
cut and deform
river reach near Gezhouba
navigation administration