摘要
简要介绍了大武口发电厂 10 0MW机组在大修停运期间 ,应用复合十八胺进行停机停炉保护试验实施过程以及保护效果的检查 。
The test procedures and effectiveness for the protection of high voltage generating set with 100 MW in the period of stop working by composite octadecylamine(ODA) are briefly introduced. It proves that it is feasible for this protection by above stated chemicals.
出处
《工业水处理》
CAS
CSCD
2001年第5期38-40,共3页
Industrial Water Treatment