摘要
对文献[2]导出的四连杆恒力弹簧吊架设计公式进行了演绎,建立了用计算机求解的系列公式。
Demonstration of the design formula for the four links permanent force spring hanger worked out with Literature [2]; setting up tha formula for calculation using computer; reference for the design of permanent force spring hanger and establishment of the standard series of permanent force spring hanger.
出处
《锅炉制造》
1999年第2期51-53,共3页
Boiler Manufacturing