摘要
通过珊溪水利枢纽工程试点期及第一期移民搬迁后在生活安置、生产发展等方面监测评估 ,对该工程移民收入和生活水平恢复进行了定量分析 。
Through monitoring and evaluation of livelihood arrangement and production development of the pilot and first stage of resettlement,this paper gives a quantitative analysis on the income and livelihood level restoration of the resettlers.A regression analysis is conducted on the relationship between resettlers' income and Engel index that reflects their livelihood.
出处
《水利学报》
EI
CSCD
北大核心
2001年第3期37-40,共4页
Journal of Hydraulic Engineering
关键词
水库移民
定量分析
珊溪水利枢纽工程
reservoir resettlement
livelihood restoration
quantitative analysis