期刊文献+

冷竹关水电站地下厂房岩锚梁施工 被引量:2

Rock Anchored Beam Construction for Underground Machine Hall of Lengzhuguan Hydroelectric Plant
下载PDF
导出
摘要 主要介绍了冷竹关水电站地下厂房岩锚梁的施工方法。
作者 孔凡彬
出处 《水电站设计》 2001年第2期51-53,共3页 Design of Hydroelectric Power Station
  • 相关文献

同被引文献15

  • 1季月伦.地下厂房的爆破振动观测[J].爆破,1995,12(2):40-40. 被引量:2
  • 2高正中,张青云,王波.坝体混凝土胶结面力学特性试验研究[J].四川水力发电,1996,15(3):45-49. 被引量:2
  • 3Lien R,Kristiansen J,Pran L S.Suspended support for crane rails in Norwegian underground power-houses[J].Internationai Water Power and Dam Construction,1990,42(4):48-50.
  • 4Johansen P M.Model field tests on crane rail beams at Skjomen and Kvilldal power stations[R].Oslo,Norway:Norwegian Geotechnical Institute,1984.
  • 5Stokkebo O,Tondevold E.Designing for year-round efficiency at ulla-forre[J].International Water Power and Dam Construction,1978,30(8):23-28.
  • 6Gill R D,Lawrenson D S.Underground works at Kenya's Kiambere Project[J].International Water Power and Dam Construction,1986,38(5):13-16.
  • 7Wang X,Solymár Z V.Design and underground construction at the Xiaolangdi multipurpose dam site[J].Tunneling and Underground Space Technology,1997,12(4):461-472.
  • 8Mehta P K.Concrete Structure,Properties and Materials,Prenticehall[M].New Jersey,USA:Inc.Englewood Cliffs,1986.
  • 9Liao K Y,Chang P K,Peng Y N.A study on characteristics of interfacial transition zone in concrete[J].Cement and Concrete Research,2004,30(6):977-989.
  • 10Cowper G R,Symonds P S.Strain-hardening and strain-rate effects on the impact loading of cantilever beams[R].Providence,USA:Division of Applied Mathematics,Brown University,1957.

引证文献2

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部