摘要
我厂经过不断地探索实践 ,总结出了一套较完整的水轮机备品修复工艺。通过在立式车床上改装立式镗头后 ,成功地解决了水轮机顶盖、底环导叶轴孔同镗 ,因而提高了大修回装精度和速度 ,经济效益显著 。
For Repair for spare parts of turbine,a series of more integrated repairing techniques are summarized by our plant through continuous research and practice .Vertical boring head is refitted on vertical lathe to bore turbine head cover and guide vane bearing hole on bottom ring together .In this way,precision and speed for back installation in general overhaul is improved and economic benefit is obvious.It is valuable to popularize this technique at power plants in a mountainous area.
出处
《四川水力发电》
2001年第1期79-81,共3页
Sichuan Hydropower
关键词
立式车床
导叶轴孔
同镗
水轮机
vertical lathe
rebuild
guide vane bearing hole
bore together