摘要
在对辽河油田沈阳采油厂污水处理厂降水工程设计与施工中 ,采用了深层搅拌桩、帷幕阻水墙阻水技术 ,解决了基坑降水。
The paper introduces the design and construction of the wastewater disposal factory of Shenyang Oil Extraction Plant, Liaohe Oil Field, and proposes the key technology of the ground hole rainfall. The technology can solve the difficulties of construction and rainfall influence on ground construction.
出处
《沈阳建筑工程学院学报》
2001年第3期203-205,共3页
Journal of Shenyang Archit Civil Eng Univ: Nat Sci