摘要 东武仕水库除险加固工程的重点是放缓上游坝坡 ,施工难点是处理坝前淤泥问题 .该淤泥层松软、饱水、强度低 .经方案论证 ,施工中采用砂井加压坡平台的处理方案 ,加速了地基的固结 ,提高了地基承载能力 .此施工方法达到了预期效果 。 The reinforcement project of Dong wushi Reservoir was carried out in 1997. The main point of reinforcement is to decrease the dam slope of the upper reaches. The difficulty is that process of construction must deal with the sludge layer in front of the dam . The sludge layer is very soft, saturated and it's strength is very low. Sand well and pressing slope platform is adopted in the process of constrution, which accelerates the rate of consolidation and heightens the carrying capacity of the foundation.
出处 《华北水利水电学院学报》 2001年第2期33-37,共5页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 淤泥地基 砂井 压坡体 地基强度 水库 除险加固 sludge foundation, sand well pressing slope body the strength of foundation
  • 相关文献

参考文献1

  • 1华东水利学院.土工原理与计算[M].北京:水利电力出版社,1979.286-289.

共引文献3

同被引文献10

引证文献1

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部