摘要
本文对一搁置多年无法用常规开采的残矿体进行方案论证和技术经济评估,得出原地破碎浸出方法回收铀可行的结论。
The mining programme for recovering a uranium ore body remained for many years and unsuitable for the traditional mining was demonstrated and evaluated technico-economically. The conclusion of recovering it by stope leaching was obtained.
出处
《铀矿冶》
CAS
1993年第4期226-229,共4页
Uranium Mining and Metallurgy